Home › Blog › PPWR Deadline: What's Now in Force (12 Aug 2026)
The 12 August 2026 PPWR Deadline: What Changed, and What Applies Now
The PPWR deadline was 12 August 2026 — it passed two days ago. Regulation (EU) 2025/40 has stopped being something to prepare for and is now the law your packaging is judged against. There was a lot of vague talk about "the PPWR coming into effect." This post cuts through it: here is exactly what applies now, what is still to come, and what enforcement looks like today.
Short version: five obligations are now switched on — conformity paperwork, PFAS limits for food-contact packaging, producer registration, the heavy metals limit, and packaging minimisation. Everything else on the PPWR timeline comes later, but day one is already enough to stop your goods at the border if you ignore it.
Since the PPWR deadline of 12 August 2026, Regulation (EU) 2025/40 applies across the EU. Packaging needs a declaration of conformity and technical documentation, food-contact packaging must meet strict PFAS limits with no grandfathering of old stock, producers must be registered in each member state's packaging register (or have an authorised representative), packaging must meet the 100 mg/kg heavy metals limit, and packaging minimisation duties are in force. Non-compliant goods can already be refused at the border.
When does the PPWR apply — and to which packaging?
The regulation entered into force on 11 February 2025 and has applied from 12 August 2026. From that date it replaced the Packaging Directive 94/62/EC. Because the PPWR is a regulation, not a directive, it applies directly in every member state. There is no national transposition, no country-by-country lag, and no "our market hasn't implemented it yet" excuse — that excuse expired with the deadline.
Scope: all packaging placed on the EU market. Sales packaging, grouped packaging, transport packaging. EU producers and non-EU exporters alike. If you ship into the EU from outside, your importer is responsible for compliance — and customs can refuse non-compliant goods at the border, starting now. The full legal text is on EUR-Lex.
Day-one duty 1: declaration of conformity and technical documentation
Since 12 August 2026, each packaging type placed on the market must be covered by a declaration of conformity, backed by technical documentation that proves the claims in it.
This is the duty most companies underestimated, because it is paperwork — and paperwork feels postponable. It was not, and it still is not. The declaration is the legal anchor for everything else: when a market surveillance authority or a customer asks whether your packaging complies, the declaration and the technical file are the answer. No file means no demonstrable compliance, whatever the packaging itself is made of, and authorities can ask for it today.
Practical implication: you need an inventory of every packaging type you use, then a conformity file per type. For a mid-sized brand that is often dozens of files. If you have not started, begin with your highest-volume SKUs and work down.
Day-one duty 2: PFAS limits for food-contact packaging
Since the same date, food-contact packaging must meet limits on intentionally added PFAS:
- 25 ppb for any single targeted PFAS (polymeric PFAS excluded)
- 250 ppb for the sum of targeted PFAS (polymeric PFAS excluded)
- 50 ppm total fluorine, including polymeric PFAS
The detail that hurts: there is no grandfathering. Stock that exceeds the limits cannot be placed on the market, no matter when it was produced. Warehouses full of PFAS-coated burger wraps or grease-resistant board are unsellable in the EU as of now. If food-contact packaging is your business, our PFAS ban in food packaging guide walks through testing, supplier declarations, and stock run-down planning in detail.
Day-one duty 3: packaging minimisation applies
The principle that packaging must be reduced to the minimum necessary for its function has applied since 12 August 2026. The hard numeric cap — maximum 50% empty space for grouped, transport, and e-commerce packaging — does not arrive until 1 January 2030, but the general duty is already live.
In practice, enforcement does not mean inspectors show up with rulers. It means a legal standard now exists that your packaging choices can be measured against. Obviously oversized boxes, double-walled cartons with no protective purpose, and decorative volume are legal liabilities now, not just cost inefficiencies. Document the functional justification for your pack sizes — that documentation belongs in the technical file anyway.
Day-one duty 4: EPR and producer registration
Since 12 August 2026, the "producer" — the company placing packaging on a given EU member state's market — must be registered in that state's official packaging producer register, or have appointed an authorised representative there, before placing packaging on that market.
This runs through national systems, not a single EU portal. Germany's register (see verpackungsregister.org) is the best-known example; other member states run their own equivalents. If you sell packaged goods into several EU countries, you may need a separate registration — or authorised representative — in each one. The UK, for reference, operates a related but separate extended producer responsibility regime for packaging (see business.gov.uk) — worth flagging for companies that treat "the EU" and "Europe" as interchangeable.
Missing registration is a straightforward, checkable gap for a market surveillance authority, and one that is easy to overlook next to the higher-profile PFAS and conformity-documentation duties.
Day-one duty 5: the heavy metals limit
Article 5 of the PPWR caps the combined presence of lead, cadmium, mercury, and hexavalent chromium in packaging and packaging components at 100 mg/kg. This limit applies from 12 August 2026 alongside the PFAS rules for food-contact packaging — but it is not limited to food-contact materials; it covers packaging and packaging components generally.
Compliance evidence for the heavy metals limit belongs in the same technical documentation file as your declaration of conformity, so in practice this is largely an extension of Duty 1 rather than a separate workstream. It is, however, a distinct legal requirement, and it is worth confirming explicitly with suppliers rather than assuming it is already covered by existing material safety data.
What does not change on 12 August 2026
Half the panic we saw before the deadline came from compressed timelines — companies believing every PPWR requirement lands at once. It did not. Here is the split:
| Requirement | Applies from 12 Aug 2026? | Actual date |
|---|---|---|
| Declaration of conformity + technical documentation | Yes | 12 Aug 2026 |
| PFAS limits, food-contact packaging | Yes | 12 Aug 2026 |
| Producer / EPR registration in each member state market | Yes | 12 Aug 2026 |
| Heavy metals limit (Pb+Cd+Hg+Cr6+ ≤100 mg/kg) | Yes | 12 Aug 2026 |
| Packaging minimisation duty | Yes | 12 Aug 2026 |
| Harmonised labelling (material, sorting) | No | 12 Aug 2028 |
| Deposit-return systems, single-use bottles/cans ≤3L | No | 1 Jan 2029 |
| Recyclability grades A–C only, 70% recyclable per unit | No | 1 Jan 2030 |
| Recycled content minimums for plastic packaging | No | 1 Jan 2030 |
| 50% empty space cap (grouped, transport, e-commerce) | No | 1 Jan 2030 |
| Reuse targets, transport and beverage packaging | No | 2030 |
| Recyclable "at scale" in practice | No | 1 Jan 2035 |
The full fifteen-year picture, with planning advice for each date, is on our PPWR timeline 2025–2040 page.
No transition period: what enforcement looks like now
There was no grace period built into the deadline, and there isn't one now that it has passed. The eighteen months from entry into force to application date was the transition period, and it is over. The European Commission published its final PPWR guidance ahead of the August 2026 date, removing the "we were waiting for clarity" defence — and "we're still transitioning" is no longer available either.
Enforcement is national. Each member state sets its own penalties, so there is no single EU fine schedule, but the toolkit is the same everywhere: fines, forced market withdrawal, and refusal of goods at the border. For importers, border refusal is the sharpest risk — a rejected shipment costs you the goods, the freight, and the customer, all at once.
In practice, this means authorities can now request your declaration of conformity, technical documentation, and proof of producer registration at any time. This is no longer a future risk to plan around — it is live, as of two days ago.
One more thing keeps moving after day one: the Commission continues to adopt delegated and implementing acts that fill in technical detail under the regulation. Compliance is not a one-time project. Our guide to PPWR delegated acts explains what is still being written and how to stay current.
Now that the deadline has passed: a realistic priority list
If you are reading this after 12 August 2026 and you are not fully ready, prioritise ruthlessly — the same triage as before, just with less runway and live enforcement risk instead of a countdown:
- Food-contact PFAS first. It is the only day-one rule that makes physical stock unsellable outright. If you have not tested or collected supplier declarations, do it now, and stop placing non-compliant stock on the EU market immediately — it cannot legally be sold regardless of when it was produced.
- Conformity files for top SKUs. Cover the packaging types that carry most of your revenue first. A partial but prioritised documentation set beats a complete plan with nothing finished, and it is a far better position if an authority asks today.
- Producer registration. Check your registration status in every member state where you place packaging on the market. This is a binary, checkable gap, and often one of the fastest to close.
- Importer agreements. If you import, confirm in writing who holds the documentation and who answers authorities. If you export to the EU, your importers are now demanding these files, not just asking about them.
- Log the gaps. Whatever you cannot finish this week, document the gap and the closure plan. If you are already non-compliant, read your realistic options after missing the PPWR deadline — there is a right way and a wrong way to be late.
You can check every date against our deadline tracker, and find guides for every obligation in the blog.
PPWR deadline: frequently asked questions
What is the PPWR deadline?
The main PPWR deadline was 12 August 2026, and it has passed. That is the date Regulation (EU) 2025/40 began applying across the EU, replacing the Packaging Directive 94/62/EC. Since that day, packaging needs a declaration of conformity and technical documentation, PFAS limits apply to food-contact packaging, producers must be registered in each member state's packaging register, the 100 mg/kg heavy metals limit applies, and minimisation duties are in force.
Does the PPWR deadline apply to non-EU companies?
Yes. The PPWR applies to all packaging placed on the EU market, including packaging on goods from non-EU companies. The importer carries the compliance responsibility, and non-compliant goods can be refused at the EU border.
Can I still sell existing stock after 12 August 2026?
Not if it exceeds the PFAS limits or fails the heavy metals limit — this is a live rule now, not a future one. For PFAS in food-contact packaging there is no grandfathering: stock exceeding the limits cannot be placed on the market, regardless of when it was made. For other duties, what matters is whether the packaging you place on the market meets the applicable requirements and is covered by conformity documentation and producer registration.
Is there a transition period after the PPWR applies?
No. The transition period was the eighteen months between entry into force on 11 February 2025 and the application date of 12 August 2026, and it is now over. Member states can enforce with fines, market withdrawal, and border refusal today.
What PPWR rules do not start on 12 August 2026?
Harmonised labelling applies from 12 August 2028. Deposit-return systems for single-use plastic bottles and metal beverage containers up to 3 litres are required in each member state from 1 January 2029. Recyclability grades A–C, recycled content minimums, the 50% empty space cap, and reuse targets apply from 1 January 2030. Recyclable at scale applies from 2035, grades A–B only from 2038, and higher recycled content targets from 2040.
The PPWR deadline has passed, and the obligations it triggered are no longer theoretical — they are what your packaging is judged against today, everywhere in the EU at once. Day one asked for five things: conformity documentation, PFAS-compliant food-contact packaging, producer registration, the heavy metals limit, and minimised packaging. Get those in order now and you buy yourself the room to handle 2028 and 2030 properly.
Is your packaging compliant now that the PPWR applies?
We match you with a PPWR consultant who has done this work in your industry. Free matching call. Reply within one business day.
Get matched with a PPWR consultant